Wastewater Engineering and Management Plan for Boston Harbor - Eastern Massachusetts Metropolitan Area EMMA Study. Technical Data Volume 12. Financing and Management.
Abstract
This volume contains the findings of the management phase of the EMMA study and is presented in two parts (Part 1 and Part 2). The objectives of the management phase were to evaluate and recommend modification to the organizational entity and financial mechanisms required to manage, administer, control, fund and operate the recommended system.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1975
- Accession Number
- ADA036806