The Codorus Creek Wastewater Management Study. Appendix A. Technical Studies. Volume IV.

Abstract

Analysis of wastewater management problems and solution opportunities in the Codorus Creek STudy program has led to the formulation and analysis of a broad range of technology and design choices for area selection. The alternatives formulated have encompassed: (1) a range of specific solutions that have been generally advocated for the area; (2) a range of basic technology choices for achieving the high level of advanced treatment deemed ultimately required; (3) alternative levels of performance capability for initial improvements; and (4) a broad range of institutional management choices and limitations. The alternatives formulation and technologic, policy and citizen review processes have led to the selection of a final group of choices for plan selection. This final group represents a refinement of initial alternatives with respect to technical feasibility, design basis, facility elements and project costs. This report presents each of these plans which constitute the finalized 'Alternatives for Choice' applicable to the Codorus Creek Study Area.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1972
Accession Number
ADA036856

Entities

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Construction
  • Cost Estimates
  • Drainage Basins
  • Engineering
  • Flow
  • Labor
  • Maintenance Costs
  • Plastic Explosives
  • Pumping Stations
  • Sewers
  • Stormwater Management
  • Urban Areas
  • Waste Products
  • Waste Water
  • Water
  • Water Purification
  • Water Supplies

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Systems Analysis and Design