Cost of Terminating Contracts Study (COTCOS-I).

Abstract

This study had as its object the development of a curve of termination liability for use on Army aircraft contracts. An equally likely or average curve was graphically developed from five sets of contract data. From this graphical curve and equation was developed. This equation provided an analytical curve that almost perfectly reproduced the original graphical curve. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1976
Accession Number
ADA037408

Entities

People

  • J. S. Sutterfield

Tags

DTIC Thesaurus Topics

  • Air Force
  • Aircrafts
  • Airframes
  • Army Aircraft
  • Army Aviation
  • Computer Programs
  • Contractors
  • Contracts
  • Data Sets
  • Equations
  • Executives
  • Foreign Military Sales
  • Government Furnished Equipment
  • Payment
  • Procurement
  • Production
  • Security

Readers

  • Control Systems Engineering.
  • Technical Research and Report Writing.