How to Get the Most From the Cost/Schedule Control System Criteria.

Abstract

This report provides lessons learned in the use of management system validated under the Department of Defense Cost/Schedule Control System Criteria (C/SCSC) in the management of an aircraft development program. These lessons, based on the author's experience as the Deputy Program Manager, indicate that the success of such a system is dependent upon management support of the system, use of the system by the technical managers, training of the technical managers in its use, and tailoring the reports to the needs of the technical managers. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1976
Accession Number
ADA037994

Entities

People

  • Robert Letchworth

Organizations

  • Defense Systems Management College

Tags

Communities of Interest

  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircrafts
  • Contractors
  • Contracts
  • Control Systems
  • Cost Overruns
  • Defense Systems
  • Engineering
  • Engineers
  • Fabrication
  • Governments
  • Lessons Learned
  • Manufacturing
  • Manufacturing Engineering
  • Procurement
  • Project Management
  • Systems Management
  • Training

Readers

  • Defense Acquisition Program Management