Initial NTIPP Functional Requirements. Task 2.

Abstract

This Task 2 report documents the preliminary requirements established as the output of the second of seven tasks in Phase I, Systems and Feasibility Tradeoff Analyses (SFTOA) within the Navy Technical Information Presentation Program (NTIPP) under the above-cited contract number. The technical approach to TAsk 2 involved the application of engineering judgment to the information base produced in Task 1, Analysis of Current and Proposed Technical Manual Systems. Requirements have been synthesized at the overall NTIPP level and at the level of the nine Research Issues which continue to be used as focal points around which the SFTOA research is conducted. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 24, 1977
Accession Number
ADA038161

Entities

Organizations

  • Hughes Aircraft Company

Tags

Communities of Interest

  • Cyber
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acceptability
  • Aerospace Industry
  • Business Administration
  • Closed Loop Systems
  • Computers
  • Contractors
  • Contracts
  • Control Systems
  • Data Acquisition
  • Databases
  • Human Factors Engineering
  • Logistics
  • Maintenance
  • Organizational Structure
  • Risk Analysis
  • Standards
  • Systems Engineering

Readers

  • Software Engineering
  • Speech Processing/Speech Recognition.
  • Wave Propagation and Nonlinear Chaotic Dynamics.