Preliminary Design of a Total Utility Pilot Demonstration Project at a Regional Standard EM Barracks Complex Fort Belvoir, Va.
Abstract
A Total Utility (T.U.) preliminary design is to be implemented at any 1200 man Regional Standard E.M. Barracks Complex and generated from the 1200 man Regional Standard E.M. Barracks located at Fort Belvoir, VA; incorporating the materials, methods fabrication and construction practiced at this site. This preliminary design incorporates the following: (1) T.U. plant that can supply the entire site with electricity, space heating and cooling. (2) An advanced technology sewage treatment facility interfaced with the total energy section for disposal of sludge and primary clarified effluent. (3) An incinerator for disposal of barracks and mess facility burnable trash interfaced with the TU plant through heat recovery and thermal storage facilities. (4) Major equipment selections for the T.U. plant. (5) All demand load profiles for the site. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 15, 1976
- Accession Number
- ADA038722
Entities
People
- Leonard Korobkin