Preliminary Design of a Total Utility Pilot Demonstration Project at a Regional Standard EM Barracks Complex Fort Belvoir, Va.

Abstract

A Total Utility (T.U.) preliminary design is to be implemented at any 1200 man Regional Standard E.M. Barracks Complex and generated from the 1200 man Regional Standard E.M. Barracks located at Fort Belvoir, VA; incorporating the materials, methods fabrication and construction practiced at this site. This preliminary design incorporates the following: (1) T.U. plant that can supply the entire site with electricity, space heating and cooling. (2) An advanced technology sewage treatment facility interfaced with the total energy section for disposal of sludge and primary clarified effluent. (3) An incinerator for disposal of barracks and mess facility burnable trash interfaced with the TU plant through heat recovery and thermal storage facilities. (4) Major equipment selections for the T.U. plant. (5) All demand load profiles for the site. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 15, 1976
Accession Number
ADA038722

Entities

People

  • Leonard Korobkin

Tags

Communities of Interest

  • Advanced Electronics
  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Accuracy
  • Combustion
  • Control Panels
  • Control Systems
  • Control Systems Engineering
  • Electric Power
  • Electrical Equipment
  • Gases
  • Heat Transfer
  • Material Degradation Processes
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Measurement
  • Medical Personnel
  • Transducers
  • Voltage Regulators

Readers

  • Energy Conservation and Renewable Energy Engineering.
  • Environmental Engineering.
  • Urban Planning and Geography.

Technology Areas

  • Space