The Army Requirements Process.
Abstract
This report describes the Army Requirements Process from the conceptual plans through ASARC/DSARC I in order to determine what the Army has done to implement DOD 5000.1. After a brief introduction, the author traces how the Army determines what it needs, i.e., the source of the documentation. Next, the present documentation required to go to DSARC I is reviewed along with the documents that it replaces. He then evaluates how the Army has met the intent of DOD 5000.1 and what the Army is doing to reduce the overall cost and the time necessary to develop the new requirements.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 15, 1974
- Accession Number
- ADA039731
Entities
People
- William F. Fletcher
Organizations
- Defense Systems Management College