Development of Water Resources in Appalachia. Volume 17. Appendix B. Power Supply and Requirements.
Abstract
This document furnishes general information on the electric power industry in and adjacent to the Appalachian Region, and it presents estimates of future power requirements and other data which may be used for guidance in selecting resource projects for further study and future development. Some of the projects may be chiefly electric power oriented, and others may only have electric power associated with their other purposes. Some would be hydroelectric developments with either conventional or pumped-storage installations, or a combination of both. Others may be needed for condensing water requirements for large thermal-electric installations. The data in this Volume should aid in reaching a proper judgment concerning electric power matters and in selecting the proper resource projects for development.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1968
- Accession Number
- ADA041402
Entities
Organizations
- United States Army Corps of Engineers