Preliminary Design, Vertical Stores Handling Conveyor

Abstract

The primary purpose of Phase II of Research and Development Contract No. N00024-72-C-5500 was to prepare detailed preliminary design drawings based on the concepts developed and approved in Phase I. Phase II also required the preparation and submittal of: a Final Reliability Program, a Final Maintainability Program, a Failure Modes and Effects Selection Criteria Report, a Final Failure Modes and Effects Analysis, detailed design calculations, various Engineering Studies and Investigations. Drawings, programs, plans, studies, investigations and reports have been completed and submitted fulfilling all requirements of Phase 2.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1977
Accession Number
ADA043055

Tags

Communities of Interest

  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Accuracy
  • Control Systems
  • Engineers
  • Fabrication
  • Failure Mode And Effect Analysis
  • Friction
  • Industrial Plants
  • Maintenance
  • Management Personnel
  • Motor Starters
  • Plastic Explosives
  • Pressure Regulators
  • Reliability
  • Safety
  • Safety Equipment
  • Test And Evaluation
  • Transducers

Fields of Study

  • Engineering
  • Physics

Readers

  • Software Engineering