Preliminary Design, Vertical Stores Handling Conveyor
Abstract
The primary purpose of Phase II of Research and Development Contract No. N00024-72-C-5500 was to prepare detailed preliminary design drawings based on the concepts developed and approved in Phase I. Phase II also required the preparation and submittal of: a Final Reliability Program, a Final Maintainability Program, a Failure Modes and Effects Selection Criteria Report, a Final Failure Modes and Effects Analysis, detailed design calculations, various Engineering Studies and Investigations. Drawings, programs, plans, studies, investigations and reports have been completed and submitted fulfilling all requirements of Phase 2.