Stationary Gas Turbine-Generator Set Acceptance Testing Procedures, Methods, and Instructions
Abstract
This report establishes procedures for acceptance testing gas turbine-generator sets intended for installation in fixed military facilities. The new test procedures, numbered CE-TP-2001 through 2003, are designed for use by Corps of Engineers Division and District personnel. Also included are lists of MIL-STD-705B test methods and Corps of Engineers diesel engine generator set test procedures that apply directly to acceptance testing gas turbine-generator sets.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1977
- Accession Number
- ADA043170
Entities
People
- E. M. Takemori
- Seh Wook Lee
Organizations
- Construction Engineering Research Laboratory