A Prototype Procedure for the Local Generation of Facility Requirements.
Abstract
This report describes a prototype procedure developed in the first phase of an ongoing study to develop tools and procedures for using organizations at the installation level to use in formulating functional requirements for facilities in the Military Construction, Army program. The requirements generation prototype procedure described in this report was developed in actual field test situations at three sites. The procedure consists of four phases-getting started, establishing facts, making judgements, and summarizing. The steps in each phase and the responsibilities of specific individuals and groups in each step are described, as is the training required for accomplishment of each phase. Future plans for testing and improving the prototype procedure are outlined. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1977
- Accession Number
- ADA043172
Entities
People
- David L. Dressel
- John H. Burgess
- Roger L. Brauer
- Wayne D. Veneklasen
Organizations
- Construction Engineering Research Laboratory