Plant Equipment Package (PEP) Modernization Program. Volume 8. Operation Plan.

Abstract

Activities required to be performed by Government in completing and updating approved recommendations contained in PEP Modernization Program are identified. The execution of PEP modernization in four areas is discussed: (1) Interface with integrated planning, (2) Identification of task input from PEP Modernization Program, (3) Validation and Updating data, (4) Plant equipment rehabilitation. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1977
Accession Number
ADA045504

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Ammunition
  • Contracts
  • Cost Analysis
  • End Items
  • Engineering
  • Engineers
  • Governments
  • Industrial Equipment
  • Industrial Preparedness
  • Machine Tools
  • Manufacturing
  • Munitions
  • Procurement
  • Production
  • Raman Spectroscopy
  • Standards
  • Test And Evaluation

Readers

  • Facility/Structural Engineering.
  • Software Engineering