1977 Inspection of Experimental Marine Piling at Pearl Harbor, Hawaii.
Abstract
The cooperative-, CEL-, and CEL/Industry-treated piles at Pearl Harbor were inspected by a diver in April 1977. The remaining cooperative-treated piles are performing satisfactorily as are many CEL- and CEL/Industry-treated piles. These piles were impregnated with either creosote containing a toxic additive, a solution containing two toxic compounds, or a dual treatment. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1977
- Accession Number
- ADA049229
Entities
People
- Thorndyke Roe Jr.
Organizations
- Naval Facilities Engineering Service Center