Definition of Requirements for Integrating User Equipment Set Z into Global Positioning System Phase I Test Aircraft. Volume I. Management Summary.

Abstract

The primary goals of the GPS User Equipment Set Z Integration Task conducted by ARINC Research Corporation were: To identify and define the requirements for integrating the Global Positioning System User Equipment Set Z into four Air Force and one Navy aircraft specified for Phase I IOT and E; and To define an Integration Module (IM) for GPS Set Z equipment, as an interface device between Set Z and selected indicators or displays aboard the specified aircraft. Conclusions and recommendations resulting from work performed toward the two goals of the integration task are presented.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1975
Accession Number
ADA051811

Entities

People

  • B. G. Mcelhaney
  • G. R. O'bryan
  • J. E. Nicholson
  • J. N. Schaefer
  • K. J. Braman

Organizations

  • ARINC

Tags

Communities of Interest

  • Air Platforms
  • Ground and Sea Platforms
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Aircraft Equipment
  • Aircrafts
  • Airframes
  • Control Systems
  • Flight Control Systems
  • Flight Instruments
  • Global Positioning Systems
  • Guidance
  • Heading Indicators
  • Horizontal Situation Indicators
  • Inertial Navigation
  • Navigation
  • Navigators
  • Radio Navigation
  • Test And Evaluation

Readers

  • Aerospace Engineering.
  • Aerospace Test and Evaluation
  • Software Engineering

Technology Areas

  • 5G
  • 5G - DoD 5G Program
  • 5G - Internet of Things
  • Space