Advance Overhaul Planning for USS GRAPPLE (ARS-7) and USS BOLSTER (ARS-38).

Abstract

Postoverhaul analysis reports of two fleet ocean tugs of the Service Force, Pacific, are presented. The reports relate to the 1975 regular overhauls of the USS GRAPPLE (ARS-7) and USS BOLSTER (ARS-38). (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1975
Accession Number
ADA051883

Entities

Organizations

  • ARINC

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Air Compressors
  • Compressors
  • Contracts
  • Corporations
  • Electrical Equipment
  • Engine Components
  • Fire Protection
  • Fuel Oils
  • Maintenance
  • Maintenance Requirements
  • Materials
  • Mechanical Components
  • Motor Generators
  • Munitions
  • Tenders (Vessels)
  • Test Equipment
  • Two Dimensional

Readers

  • Aerospace Engineering
  • Military History of the United States in the 20th Century.
  • Oceanography.