DD-Type Management Plan and Program Outlines for Use in PEB/LOE Preparation.

Abstract

This document contains information that will be helpful to ship personnel in preparing for the PEB/LOEs. An LOE is conducted by the PEB before the first fire is lighted in a boiler in each fireroom during a regular overhaul (ROH). The Board reviews administrative, training, and material readiness for the light-off of each propulsion plant. (Actual light-off of the plant is not a part of the examination). This document is assembled into five basic sections, identified by tabs. Tab A, 'Management Plan', contains a milestone chart for PEB/LOE preparation. Tab B, 'Management Plan Action Required Form', is provided as a check-off planning and monitoring document. Tabs C through E are entitled, respectively, 'Administrative Preparation', 'Training Preparation', and 'Material Preparation'.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1975
Accession Number
ADA052233

Entities

Organizations

  • ARINC

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Electrical Equipment
  • Engineering
  • Engineers
  • Feed Water
  • Fuel Oils
  • Instructions
  • Maintenance
  • Management Personnel
  • Materials
  • Mechanical Equipment
  • Medical Personnel
  • Personnel Management
  • Scheduling (Production)
  • Ship Personnel
  • Ships
  • Supervisors
  • Training

Readers

  • Business Analytics
  • Naval Architecture and Marine Engineering.