PEB/LOE Preparation Assistance Program. Interim Evaluation Report for USS Francis HAMMOND (DE-1067) USS MARVIN SHIELDS (DE-1066).
Abstract
This interim report, prepared in accordance with Task 10 of the contract task order, is intended to; Present the criteria that constitute a baseline for evaluating the effectiveness of the PEB/LOE Preparation Assistance Program; Present the data resulting from LOE preparation efforts of two DE-class ships selected by ARINC Research as a baseline group, and two designated by PERA(CRUDES) for the assistance program; Compare the data for the 'baseline' and 'program' ships; and Evaluate the data and comparisons to determine the effectiveness of the assistance program. The ships selected as the baseline group are USS MEYERKORD (DE-1058) and USS ROARK (DE-1053). The PEB/LOE preparation activities on these ships will be compared (through appropriate data elements) with the corresponding activities of the first two ships to participate in the assistance program- USS FRANCIS HAMMOND (DE-1067) and USS MARVIN SHIELDS (DE-1066).
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1975
- Accession Number
- ADA052248
Entities
People
- F. K. Glaser
Organizations
- ARINC