Missile-X Program Logistic Element Management Plan for Support and Test Equipment LEM.

Abstract

This Support and Test Equipment Logistic Element Management Plan is one of twelve plans supplementing the guidance and direction for the Integrated Logistic Support (ILS) program as delineated in the Missile-X Integrated Logistic Support Plan Logistic elements into the overall program requirements, this plan treats the specific actions, milestones, and coordination efforts of the Logistic Element Manager for Support and Test Equipment (SE-LEM). It has been written to assist him in fulfilling his responsibilities toward achieving the ILS objectives of the MX Program.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 15, 1977
Accession Number
ADA052249

Entities

People

  • A. J. Fremer
  • A. N. Winter

Organizations

  • ARINC

Tags

Communities of Interest

  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Ballistic Missiles
  • Contracts
  • Engineering
  • Failure Mode And Effect Analysis
  • Information Systems
  • Intercontinental Ballistic Missiles
  • Logistics
  • Maintenance
  • Management Information Systems
  • Organizational Structure
  • Procurement
  • Program Management
  • Systems Engineering
  • Test And Evaluation
  • Test Equipment
  • Weapon Systems

Readers

  • Aerospace Test and Evaluation
  • Logistics and Supply Chain Management.