Quarterly Interim Technical Report (2nd), Contract DAAH01-75-C-0194.
Abstract
BKD's interim STINGER simulation activities have been associated with readying the hardware for data transmission between the major system components (i.e. SDS/9300 to AD-4 and SDS/9300 to GE/3010). During the quarter, IRSS interface operation was intermittent. Extensive testing was done to discover the source of errors generated in data exchanges. Grounds, power supplies and other potential sources of noise were investigated. The problem was finally resolved by the replacement of several marginal gates, relocation of driver/receiver cards to the GE/3010's CPU chassis, and modification of the ground system. In the course of the above activities, software was generated for use in checking the SDS/9300 to GE/3010 link and the SDS/9300 to AD-4 link. Specifically, three programs were developed; A general purpose AD-4 test routine, An AD-4 discrete test routine, and A GE/3010 interface test routine.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 15, 1975
- Accession Number
- ADA052678