Quarterly Interim Technical Report (4th), Contract DAAH01-75-C-0194.

Abstract

B-K Dynamics' activities during the fourth quarter (15 July-15 October 1975) focused on documentation of the Interim STINGER simulation and its related hardware components. This report presents documentation of the Software Checkout Chassis (SCC) which was constructed to assist in debugging the real time software and provides additional details on the STINGER simulation including; A functional description of the simulation elements, Specific equations currently implemented, and Detailed input/output descriptions.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 15, 1975
Accession Number
ADA052680

Tags

Communities of Interest

  • Energy and Power Technologies
  • Weapons Technologies

DTIC Thesaurus Topics

  • Birds
  • Central Processing Units
  • Circuit Boards
  • Computer Programming
  • Computer Programs
  • Computers
  • Delay
  • Diagrams
  • Generators
  • Human Factors Engineering
  • Instruction Set Architecture
  • Microelectromechanical Systems
  • Plastic Explosives
  • Power Supplies
  • Printed Circuits
  • Range Tables
  • Schematic Diagrams

Fields of Study

  • Computer science

Readers

  • Computer Science.
  • Software Engineering
  • Technical Research and Report Writing.