Reliability, Maintainability, Strategic Reliability, and Life Cycle Cost Comparison Analysis of Three Alternative Mk 71 Mod 0 Gun Mount Control System Designs
Abstract
This report summarizes the work conducted by ARINC Research Corporation under Contract N00197-76-C-0141, Tasks 3 and 4, for the Gun System Engineering Center/Naval Ordnance Station, Louisville, Kentucky. These contract tasks required comparisons of reliability, maintainability, strategic reliability, and life cycle costs of three alternate control systems for the 8in./55 Caliber Mk 71 Mod 0 Major Caliber Light Weight Gun (MCLWG) and a review of a preliminary development specification for a microprocessor-based control system for this gun.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1978
- Accession Number
- ADA061148
Entities
People
- P. Klimowitch
Organizations
- ARINC