National Dam Inspection Report. Williams Bridge Dam, Pennsylvania Gas and Water Company (NDS-ID-373), Susquehanna River Basin, Stafford Meadow Brook, Lackawanna County. Pennsylvania. Phase I Inspection Report.
Abstract
The Dam Inspection Act, Public Law 92-367, authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of inspection of dams throughout the United States. The purpose of the inspection is to determine if the dam constitutes a hazard to human life or property.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1978
- Accession Number
- ADA063130