Prove-Out Ram Assessment Report for the 155 mm M483 LAP Line at Kansas Army Ammunition Plant

Abstract

During September 1976, Kansas AAP developed a Demonstration Test Plan (DTP) to govern the prove-out test for Project 5745509, 155 mm M483A1 Automated Assembly and Pack-Out System at KAAP. An initial prove-out was begun in November 1976 and completed in March 1977. The results of this prove-out indicated that the equipment in its configuration at the time would not meet established requrements. During the next eight months, a series of improvements were made to both the body-loading and fuze assembly systems. In November 1977, another prove-out test was initiated; the test ended on 30 December 1977. The results of this test showed that the equipment satisfies test requirements and is capable of meeting a mobilization rate of 42,000 rounds per month. This report provides the details of the reliability, availability, maintainability (RAM), and production data analyses upon which this conclusion is based.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1978
Accession Number
ADA064137

Entities

People

  • J. C. Allen
  • John G. Mardo

Organizations

  • United States Army Armament Research, Development and Engineering Center

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Ammunition
  • Assembly
  • Assembly Lines
  • Availability
  • Computer Programs
  • Computers
  • Data Analysis
  • Databases
  • Downtime
  • Failure Mode And Effect Analysis
  • Load Monitoring
  • Maintenance
  • Maintenance Personnel
  • Production
  • Production Rate
  • Projectiles
  • Reliability

Readers

  • Agricultural Chemistry/Soil Science
  • Software Engineering