1978 Inspection of Experimental Marine Piling at Pearl Harbor, Hawaii.
Abstract
In 1978, a diver made the final inspection of the cooperative-, CEL-, and CEL/industry-treated piles at Pearl Harbor. The cooperative piles are performing satisfactorily, especially those with dual treatments. Satisfactory CEL- and CEL/industry-treatments were creosote which contained a specific toxic additive or additives and creosote-free treatments which were either a solution containing two toxic compounds, or a dual treatment. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1978
- Accession Number
- ADA066225
Entities
People
- Thorndyke Roe Jr.
Organizations
- Naval Facilities Engineering Service Center