Reserve Component Unit Evaluation Analysis (Cost-Effectiveness).

Abstract

This interim report is the second of two on the study Reserve Component Unit Evaluation Analysis (Cost-Effectiveness). The First Interim Report was duly submitted to the Contract Officer's Representative (COR) on 15 May 1975. It presented a detailed study plan and a summary of progress from the start of work, 18 February 1975. At a meeting with Litton-Mellonics on 10 June 1975 the SAG discussed and commented on the study methodology proposed in the report, as a part of the discussion at the June meeting the point was made that the United States Army Forces Command (FORSCOM) and Litton-Mellonics 'should exchange information to insure instructions issued by FORSCOM for Annual Training (AT) 76 utilization of the Army Training and Evaluation Program (ARTEP) are in consonance with developments in the study.'

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 15, 1976
Accession Number
ADA066261

Entities

People

  • Andrew P. Lokie
  • James Bercos
  • John R. Chiorini
  • Richard C. Eakins
  • Warren B. Stevens

Tags

Communities of Interest

  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Ammunition
  • Army
  • Army Personnel
  • Army Training
  • Artillery
  • Birds
  • Cost Effectiveness
  • Databases
  • Delay
  • Employment
  • Engineers
  • Officer Personnel
  • Personnel Management
  • Reconnaissance
  • Task Forces
  • United States
  • Warfare

Readers

  • Defense Financial Management and Audit.
  • Life Cycle Cost Analysis
  • Military Mobilization and Reserve Forces Studies.