Reserve Component Unit Evaluation Analysis (Cost-Effectiveness).
Abstract
This interim report is the second of two on the study Reserve Component Unit Evaluation Analysis (Cost-Effectiveness). The First Interim Report was duly submitted to the Contract Officer's Representative (COR) on 15 May 1975. It presented a detailed study plan and a summary of progress from the start of work, 18 February 1975. At a meeting with Litton-Mellonics on 10 June 1975 the SAG discussed and commented on the study methodology proposed in the report, as a part of the discussion at the June meeting the point was made that the United States Army Forces Command (FORSCOM) and Litton-Mellonics 'should exchange information to insure instructions issued by FORSCOM for Annual Training (AT) 76 utilization of the Army Training and Evaluation Program (ARTEP) are in consonance with developments in the study.'
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 15, 1976
- Accession Number
- ADA066261
Entities
People
- Andrew P. Lokie
- James Bercos
- John R. Chiorini
- Richard C. Eakins
- Warren B. Stevens