Family of Military Engineer Construction Equipment (FAMECE) Prototype Qualification Test-Government (PQT-G) Test Report.

Abstract

The PQT-G generally confirmed that FAMECE meets or is capable of meeting most criteria established in the MN (Materiel Need), the detailed test plans, or other standards. With few exceptions, FAMECE was subjected to the testing as prescribed by the test plan. In other cases, testing and the corresponding results were adversely affected by such variables as weather conditions and operator experience. The folloing tests were conducted: Rail transportability; Highway transportability; Marine transportability; Endurance; Safety; Human factors; Maintainability; and Reliability and durability.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1979
Accession Number
ADA068978

Entities

People

  • Anthony Antenucci
  • Arthur B. Follansbee
  • Carl W. Hasle
  • Richard T. Eiler Jr.
  • Ronald J. Larch

Tags

Communities of Interest

  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Brake Fluids
  • Construction
  • Construction Equipment
  • Construction Materials
  • Department Of Defense
  • Diesel Fuels
  • Engineers
  • Fire Extinguishers
  • Measurement
  • Operating Systems
  • Plastic Explosives
  • Reliability
  • Safety Analysis
  • Terrorism
  • Test And Evaluation
  • Test Equipment
  • Water Resources

Readers

  • Aerospace Engineering
  • Logistics and Supply Chain Management.
  • Software Engineering