Family of Military Engineer Construction Equipment (FAMECE) Prototype Qualification Test-Government (PQT-G) Test Report.
Abstract
The PQT-G generally confirmed that FAMECE meets or is capable of meeting most criteria established in the MN (Materiel Need), the detailed test plans, or other standards. With few exceptions, FAMECE was subjected to the testing as prescribed by the test plan. In other cases, testing and the corresponding results were adversely affected by such variables as weather conditions and operator experience. The folloing tests were conducted: Rail transportability; Highway transportability; Marine transportability; Endurance; Safety; Human factors; Maintainability; and Reliability and durability.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1979
- Accession Number
- ADA068978
Entities
People
- Anthony Antenucci
- Arthur B. Follansbee
- Carl W. Hasle
- Richard T. Eiler Jr.
- Ronald J. Larch