National Dam Safety Program. Wagamons Pond (DE00061), Delaware River Basin, Broadkill River Basin, Sussex County, Delaware. Phase I Inspection Report.

Abstract

This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1979
Accession Number
ADA069616

Entities

People

  • Thomas Tyler Moore

Tags

Communities of Interest

  • Advanced Electronics
  • Human Systems

DTIC Thesaurus Topics

  • Climate Change
  • Construction
  • Dams
  • Drainage Basins
  • Earth Fills
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Floods
  • Natural Resources
  • Retaining Walls
  • United States
  • Visual Inspection
  • Walls
  • Warning Systems
  • Water

Readers

  • Hydrologic Risk Analysis and Mitigation.