Family Housing Utility Metering Program. Phase I. Installation on 3 Army Bases.

Abstract

This report covers the installation phase of the Army's portion of the DOD Family Housing Utility Metering Program directed by Congress. A description of the design, contracting and installation of the utility meters at Yuma Proving Ground, Fort Gordon and Fort Eustis is presented together with a brief description of the methods of handling the various tasks involved and the difficulties that arose as a result of the compressed time frame allotted this project. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1978
Accession Number
ADA070298

Entities

People

  • Adam F. Renner

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems
  • Sensors
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Air Temperature
  • Army Facilities
  • Contractors
  • Contracts
  • Department Of Defense
  • Electricity Meters
  • Energy Consumption
  • Engineering
  • Engineers
  • Families (Human)
  • Gas Meters
  • Military Families
  • Military Personnel
  • New York
  • Procurement
  • Standards

Readers

  • Environmental Remediation and Restoration.
  • Geodesy
  • Systems Analysis and Design