Chief Joseph Dam Columbia River, Washington. Community Impact Report Update III. Conditions at Peak Impact.

Abstract

This report examines how current peak construction social impacts on rural communities at Chief Joseph Dam, Washington compare with those projected in pre-construction phases. The report examines, in depth, the construction workers at the dam site; their previous employment, current living conditions and impacts on local communities. The report also generalizes about the methodologies for projecting social impacts. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1978
Accession Number
ADA070851

Entities

People

  • Arthur A. Harnisch

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Aerial Photographs
  • Birds
  • Drainage Basins
  • Employment
  • Engineering
  • Governments
  • Health Care
  • Health Services
  • Hospitals
  • Law
  • Medical Personnel
  • National Governments
  • Personnel Management
  • Political Systems
  • Social Sciences
  • United States
  • Water Resources

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Hydrologic Risk Analysis and Mitigation.
  • Rehabilitation and Prosthetic Care for Military Service Members and Veterans with Limb Loss or Disability.