Low Level Conversion and Expansion/Relocation of Associated Equipment at RAF Croughton AUTODIN Switching Center, England.
Abstract
This test report records the results of Quality Assurance (QA) evaluations and tests conducted during the Low Level Conversion and Expansion/Relocation of Associated Equipment at the Croughton AUTODIN Switching Center (ASC). QA inspections and tests were conducted during the period of 26 January through 3 April 1979.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 30, 1979
- Accession Number
- ADA070885