Safety Stocks in MRP Systems.

Abstract

In an MRP (Material Requirement Planning) environment requirements are often uncertain and supply is often unreliable. The uncertainties in supply and requirement quantities should be combined and protected against with safety stocks calculated in the usual way. The uncertainties in supply and requirement timing should similarly be combined and protected against with safety time. In most cases the timing protection and the quantity protection can be treated as independent and both must be provided.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1979
Accession Number
ADA072508

Entities

People

  • Harlan C. Meal

Organizations

  • Massachusetts Institute of Technology

Tags

DTIC Thesaurus Topics

  • Advanced Manufacturing
  • Assembly
  • Business Administration
  • Contracts
  • Environment
  • Inventory
  • Inventory Control
  • Lead Time
  • Manufacturing
  • Materials
  • New York
  • Operations Research
  • Procurement
  • Production
  • Production Control
  • Replenishment
  • Standards

Readers

  • Fire Suppression Systems Design.
  • Life Cycle Cost Analysis
  • Logistics and Supply Chain Management.