Built-Up Roof Construction Quality Control.
Abstract
This report recommends ways to improve the performance of built-up roofing in Army facilities by advancing roof construction quality control and quality assurance. This study assessed the state of the art in roofing quality control; evaluated existing Army Corps of Engineers quality control/quality assurance requirements related to roofing; examined the Corps' current roofing practices to determine compliance with the state of the art and Corps requirements; and provided the recommendations based on assessments of current performance. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1979
- Accession Number
- ADA073619
Entities
People
- E. Marvin
- Edward S. Lindow
- J. Blair
- M. J. Rosenfield
Organizations
- Construction Engineering Research Laboratory