National Dam Safety Program. Kinloch Farm Dam. Inventory Number: VA-06109. Fauquier County, Virginia. Phase I Inspection Report.

Abstract

Pursuant to Public Law 92-367, Phase I Inspection Reports are preapred under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D. C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computatinal evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify and need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1979
Accession Number
ADA073633

Entities

People

  • Paul Seiler

Tags

DTIC Thesaurus Topics

  • Computer Programs
  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Elevation
  • Embankments
  • Emergencies
  • Engineering
  • Engineers
  • Hazards
  • Inspection
  • Photographs
  • United States
  • Virginia
  • Visual Inspection
  • Warning Systems

Readers

  • Hydrologic Risk Analysis and Mitigation.