National Dam Safety Program. Gregory's Pond Dam (VA-04122), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report.

Abstract

Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D. C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1979
Accession Number
ADA075337

Entities

People

  • Paul Seiler

Tags

Communities of Interest

  • Counter IED

DTIC Thesaurus Topics

  • Abstracts
  • Buildings And Structures
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Field Conditions
  • Fungi
  • Guidance
  • Inspection
  • Test And Evaluation
  • United States
  • Virginia
  • Visual Inspection

Fields of Study

  • Engineering

Readers

  • Hydrologic Risk Analysis and Mitigation.