National Dam Safety Program. Finch Hollow Watershed Project, Site 1. Inventory Number NY-697 Susquehanna River Basin. Broome County, New York. Phase I Inspection Report,
Abstract
This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Finch Hollow Project-Site 1 did not reveal conditions which pose a hazard to humanlife or property. Total spillway discharge capacity is adequate for the PMF. An immediate investigation is required to ascertain the flooding potential of homes located between the dam and the highway embankment. Subsequent remedial measures must be completed within 1 year of notification. Several remedial actions during construction season are required. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1979
- Accession Number
- ADA076166
Entities
People
- George W. Koch
Organizations
- New York State Department of Environmental Conservation