National Dam Safety Program. Finch Hollow Watershed Project, Site 1. Inventory Number NY-697 Susquehanna River Basin. Broome County, New York. Phase I Inspection Report,

Abstract

This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Finch Hollow Project-Site 1 did not reveal conditions which pose a hazard to humanlife or property. Total spillway discharge capacity is adequate for the PMF. An immediate investigation is required to ascertain the flooding potential of homes located between the dam and the highway embankment. Subsequent remedial measures must be completed within 1 year of notification. Several remedial actions during construction season are required. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1979
Accession Number
ADA076166

Entities

People

  • George W. Koch

Organizations

  • New York State Department of Environmental Conservation

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Agriculture
  • Classification
  • Concrete
  • Construction
  • Dams
  • Department Of Veterans Affairs
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Excavation
  • Laser Induced Fluorescence
  • Materials
  • New York
  • Plastic Explosives
  • Reinforced Concrete
  • Visual Inspection

Readers

  • Hydrologic Risk Analysis and Mitigation.