Bikini Scientific Resurvey. Volume III. Report of the Director of Ship Material. Annex II. USS PILOTFISH (S.S.-386).
Abstract
The USS PILOTFISH was built of heavy hull construction at Portsmouth Naval Shipyard and was commissioned 16 December 1943. Ship characteristics are listed. A general and detailed description of damage is included for the USS PILOTFISH which was found sunk in about 29 fathoms of water, with the hulk buried in the bottom to about 12 ft. to 15 ft.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1947
- Accession Number
- ADA077493