Management Information Systems. Integrated Facilities System (IFS). Volume 2. Integrated Facilities Baseline Generation (IFBG) (DOS-E).
Abstract
The conversion of the Integrated Facilities System from local automated or manual systems consists of a baseline generation period and an operational cutover period. During the baseline generation period, those master files necessary for cutover to live operations will be generated. To accomplish the creation of required master files, and selected portions of the IFS operational system that pertain to editing, file building, file maintenance, and file visibility will be executed. All of the cycles required for baseline generation are contained in USACSC Manual 18-1-B-AKA, Vol III (Operations and Scheduling), with the exception of two One Time cycles which are included in this document. The purpose of this document is to provide instructions on how to use the Operations and Scheduling Manual for baseline generation. Included are narrative descriptions of each cycle, instructions on how to structure each cycle, purpose, and suggested sequence of cycles.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1979
- Accession Number
- ADA078335