Operation RANGER Nevada Test Site, January-February 1951. Volume 6. Administrative Summary Report,
Abstract
Part I of this volume is a general summary of the administrative and support activities of Operation RANGER, as performed under the direction of the Manager, SFO, in accordance with delegated authority from the General Manager in January and February 1951. The technical report of this Operation is included in separate volumes prepared in the Los Alamos Scientific Laboratory. Part II contains more specific coverage of various phases of this Operation and serves to amplify the general information given in Part I. Each of the sections of Part II was prepared by the AEC official charged with the operational phase covered. It is intended that this volume serve not only as a record of the administrative and support activities but as a guide for the future AEC execution of test programs performed within the continental limits of the United States. In some instances specific recommendations have been incorporated for future consideration, and certain of these recommendations have already been utilized in the planning for Operations BUSTER and JANGLE at the Nevada Test Site.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1952
- Accession Number
- ADA078580
Entities
People
- Carroll L. Tyler
Organizations
- Los Alamos National Laboratory