Report of Cyclotron Facility Operations October 1, 1978 through September 30, 1979.
Abstract
During the twelve month period ending September 30, 1979 the cyclotron was used in support of ten research programs for a total 1690 hours of beam on target. These research programs are summarized in this report together with the details of beam time usage and facility engineering. No major operational problems were encountered this fiscal year. This report is presented as an annual report on cyclotron facility operation.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 28, 1979
- Accession Number
- ADA079294
Entities
People
- Rollon O. Bondelid
Organizations
- United States Naval Research Laboratory