Environmental Statement, Lake City Station, Unit One.

Abstract

A detailed analysis of the environmental impacts related to the construction and operation of an oil-fueled electric generating station. The proposed plant will occupy a 639 acre site on the south shore of Lake Erie in Girard Township, Erie County, Pennsylvania. Electrical power generated by this facility will vary between 245 megawatts and 295 megawatts. The water intake and effluent discharge system will be located in Lake Erie. Approximately 1.4 million barrels of No. 2 fuel oil will be consumed annually. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 17, 1973
Accession Number
ADA079676

Entities

People

  • Paul G. Leuchner

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Birds
  • Cells
  • Eutrophication
  • Fish
  • Habitats
  • Medical Personnel
  • Wildlife

Fields of Study

  • Environmental science

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Electrical Engineering
  • Environmental Remediation and Restoration.