National Dam Inspection Program. Middle Dam (NDI-ID-PA-00256) (DER-ID-45-3) Delaware River Basin, Sambo Creek, Monroe County, Borough of East Stroudsburg. Phase I Inspection Report.

Abstract

Based on visual inspection, available records, calculations, past operational performance, and according to criteria established for these studies, Middle Dam is judged to be unsafe, non-emergency because the spillway capacity is rated as seriously inadequate. Under existing conditions, the spillway can pass only about 22 percent of the Probable Maximum Flood (PMF) without overtopping of the dam. If low areas on the top of the dam were filled to the design elevation for the top of the dam, the spillway would pass about 33 percent of the PMF. For either condition, it is judged that the dam could not withstand the depth and duration of overtopping that would occur for the 1/2 PMF. Failure of the dam would cause an increased hazard for loss of life downstream. As a whole, the dam is judged to be in fair condition.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1980
Accession Number
ADA081637

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Civil Engineering
  • Computer Programs
  • Construction
  • Delaware River
  • Drainage Basins
  • Engineering
  • Engineers
  • Floods
  • Gate Valves
  • Geography
  • Materials
  • New York
  • Plastic Explosives
  • United States
  • Visual Inspection
  • Warning Systems
  • Water Supplies

Readers

  • Hydrologic Risk Analysis and Mitigation.