Pneumatic Control Device for the Pershing 2 Adaption Kit
Abstract
A preliminary operating model (POM) for the Pneumatic Control Device (PCD) has been developed and is in line with the referenced contractual requirements. The PCD preliminary design was formulated and documented in the 31 August, 1977 Interim Technical Report. Development effort for the pneumatic control POM includes the completion of all detail drawings and their revisions, breadboard tests of the reentry sensor and gas generator, fabrication of POM parts, assembly and evaluation of the first POM, gas generator tests with POM parts for the generator and valve, interface and demonstration of PCD with SACA POM units, preparation for and completion of the twelve contractually required gas generator tests, support of the five gas generator/turboalternator compatibility tests at Garrett, analysis and verification testing of cold gas generator anomaly observed during compatibility tests, completion of the preliminary safety and reliability analysis, and preparation of associated software.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 14, 1979
- Accession Number
- ADA082564