Life Cycle Cost Estimates of the AN/WLR-1G, AN/SLQ-32(V)2, and Conceptual ESM System.

Abstract

A life cycle cost estimate is made for each of three shipboard ESM systems. One is an older equipment, the AW/WLR-1 and its ancillary items. The second is the currently evolving AN/SLQ-32. A newly conceived NOSC architecture is the basis for the third system. Material is presented that augments the cost data with the conditions under which it applies. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1979
Accession Number
ADA083008

Entities

People

  • E. L. Welker
  • J. Valenzuela

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Acquisition
  • Circuit Boards
  • Cost Estimates
  • Electron Tubes
  • Electronic Countermeasures
  • Electronic Equipment
  • Failure Mode And Effect Analysis
  • Life Cycle Costs
  • Life Cycles
  • Maintenance
  • Maintenance Costs
  • Maintenance Personnel
  • Preventive Maintenance
  • Printed Circuits
  • Procurement
  • Pulse Analyzers
  • Test Equipment

Readers

  • Computational Modeling and Simulation
  • Life Cycle Cost Analysis
  • Software Engineering.