Project Plan: Operational Evaluation of Terminal ATC with DABS.

Abstract

This report describes a two-phase effort intended to complement the on-going DABS technical tests by assessing the operational implications and man-machine interactions when DABS is integrated with the ARTS III system. The effort includes simulated and live runs with the participation of ATC controllers, and an analytical evaluation of the effect of DABS on aircraft separation requirements, ATC procedures, and controller workload. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1980
Accession Number
ADA083598

Entities

People

  • H. S. Gabrieli

Organizations

  • MITRE Corporation

Tags

Communities of Interest

  • Air Platforms
  • Human Systems
  • Sensors

DTIC Thesaurus Topics

  • Acceptability
  • Accuracy
  • Aircrafts
  • Beacons
  • Computer Programs
  • Computers
  • Data Analysis
  • Data Processing
  • Data Reduction
  • False Targets
  • Instrumentation
  • Measurement
  • Radar
  • Simulations
  • Test And Evaluation
  • Test Equipment
  • Test Facilities

Readers

  • Aviation Science / Aeronautics.
  • Defense Financial Management and Audit.
  • Technical Research and Report Writing.