Project Plan: Operational Evaluation of Terminal ATC with DABS.
Abstract
This report describes a two-phase effort intended to complement the on-going DABS technical tests by assessing the operational implications and man-machine interactions when DABS is integrated with the ARTS III system. The effort includes simulated and live runs with the participation of ATC controllers, and an analytical evaluation of the effect of DABS on aircraft separation requirements, ATC procedures, and controller workload. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1980
- Accession Number
- ADA083598
Entities
People
- H. S. Gabrieli
Organizations
- MITRE Corporation