A Comprehensive Study of the Tocks Island Lake Project and Alternatives. Part B. Review of Tocks Island Lake Project.

Abstract

The purpose of this study is to help decision makers determine future water resource needs of the Delaware River Basin area and ways of meeting these needs. This report undertaken in 1975 for the U.S. Army Corps of Engineers by an independent consultant firm comprises a brief review of the technical engineering planning performed in the development of the project in regard to the adequacy of preliminary project planning, the use of statistics in project formulation, planning procedures, eutrophication and other water quality considerations etc. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1975
Accession Number
ADA084000

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Engineered Resilient Systems
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Birds
  • Cells
  • Eutrophication
  • Fish
  • Fisheries
  • Habitats
  • Health Services
  • Medical Personnel
  • Wildlife

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Systems Analysis and Design