Gallipolis Locks and Dam Replacement Study, Ohio River. Cultural Resources Reconnaissance. Phase 1. Advanced Engineering and Design.
Abstract
In April of 1977, a reconnaissance level survey was initiated for the areas to be effected by the proposed Gallipolis Lock Replacement project. This included the canal site and disposal sites on the flood plain as well as the upland disposal sites. This report is the result of the survey.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1978
- Accession Number
- ADA084133
Entities
Organizations
- United States Army Corps of Engineers