Great Lakes and St. Lawrence Seaway Navigation Season Extension. Volume 6. Appendixes H - L

Abstract

This final report evaluates six proposals, considering various season lengths and geographic coverages, to further extend the navigation season on the entire Great Lakes/St. Lawrence Seaway System up to 12 months on the upper four Great Lakes, and up to 11 months on the Welland Canal, Lake Ontario and the International Section of the St. Lawrence River. This report relates U. S. costs to U. S. Benefits.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1979
Accession Number
ADA084208

Entities

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems
  • Space

DTIC Thesaurus Topics

  • Birds
  • Climate Change
  • Data Analysis
  • Employment
  • Environmental Protection
  • Geography
  • Habitats
  • Health Services
  • Heat Energy
  • Loran
  • Marine Transportation
  • Medical Personnel
  • Navigation
  • Organizational Structure
  • Radar Beacons
  • Ridges
  • Ships

Fields of Study

  • Environmental science

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Life Cycle Cost Analysis
  • Riverine Ecology