Ammunition Resupply Model. Volume I. Methodology and Users Manual.
Abstract
This report is one of two, produced to document the Ammunition Resupply Model (ARM). The model was designed to simulate those activities associated with ammunition resupply-demand, reload, resupply-in parallel with the play of the Jiffy war game in the evaluation of a division size force. The purpose of ARM is to assess the capability of a given TOE structure to respond to logistical demands placed upon it by various numbers of ammunition-expending weaponry. The other volume of the report is the Programmer's Manual which consists of the FORTRAN code of all the subroutines. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1980
- Accession Number
- ADA084830
Entities
People
- Donald J. Remen
- James Fox
- Robert B. Clarke