Barge Traffic Forecast and Constraint Analysis for GREAT II.
Abstract
The primary objective of this report to the Commerical Transportation Workgroup are threefold: (1) To develop a forecast of the magnitude and nature of barge traffic in the GREAT II area, (2) To forecast needs, such as barge fleeting, that will be necessary to support future barge traffic, (3) To identify alternative means of meeting these needs. Additional objectives of the report are to review the existing leterature related to forecasts of barge traffic and needs in the GREAT II area and to summarize problems involved with the commercial development of the river.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 31, 1980
- Accession Number
- ADA085157