Summary of Structural Evaluation and Design Support for the Underground Nuclear Test Program.
Abstract
During the period from June 1978 through July 1979, Engineering Decision Analysis Company, Inc., (EDAC) was under contract to provide structural evaluation and design support for the underground nuclear test program. This effort including the design and evaluation of containment structures for the DIABLO HAWK MINERS IRON and HURON KING events, design and evaluation of shock mounting systems, data reduction and evaluation of results for the DIABLO HAWK and HYBLA GOLD Tunnel Environment Monitor System (TEMS) and DIABLO HAWK High Speed Camera experiments and evaluations in support of future large cavity events. This report in a single volume, provides documentation of various design and analysis tasks accomplished under this contract.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1979
- Accession Number
- ADA085758
Entities
People
- Robert P. Kennedy
- Stephen A. Short
- Thomas R. Kipp